We have run this rescue enough times to know the shapes. Most stalled projects fit one of six. The diagnosis is usually visible inside the first week.
| Typical failure mode | What it looks like | What we do about it |
|---|---|---|
| The use case was wrong | The model works. The forecast is accurate. Nobody uses the output because it does not change a decision anyone was going to make. | Recommend kill. Redeploy the budget to a use case with a real decision attached. |
| Data foundations missing | A model or agent is built, but it cannot get clean, timely data in. Every pipeline is bespoke and half of them are red. | Recommend fix, paired with a focused foundation build (typically an AgileData platform drop-in) before the use case is resumed. |
| Ownership gap | No real internal sponsor. The project lead is a project manager without a mandate. Decisions take weeks because nobody owns them. | Recommend pause until an accountable owner is named. No owner, no restart. |
| Vendor dependency | You are locked into a platform or model provider that cannot deliver what was sold. Roadmap slips are quarterly. | Recommend reset with a platform swap. We scope the swap and the migration path. |
| Scope sprawl | 40 use cases on the backlog. Zero shipped. Every steering committee adds two more. | Recommend reset around a single use case, shipped end to end, before anything else is touched. |
| Talent gap | The project team is all analysts and a project manager. No engineers. The code is running in a notebook on someone's laptop. | Recommend an embedded build team (Forward Deployed Engineers) as the fix path. Analysts stay for domain. Engineers ship. |
Blunt version: most stalled projects are not technology problems. They are scope, ownership, or capability problems dressed up as technology problems. The rescue names which one.